Link cost data directly to BIM model elements — generating automated quantity takeoffs, accurate BOQ, and dynamic budgets that update in real time as design evolves. Serving infrastructure and building projects across Gujarat and India.
5D BIM Cost Estimation brings financial intelligence directly into the building model. At HRP Infra, Ahmedabad, we attach cost parameters to every BIM element — from a single RCC column to an entire building floor plate — enabling automatic quantity extraction and live cost reporting that evolves with your design.
Traditional quantity takeoff from 2D drawings is time-consuming, manual, and error-prone. Our BIM-based approach extracts quantities automatically from the model geometry, applies current market or government schedule rates (CPWD/DSR, GWSSB, GERI for Gujarat), and produces construction-ready BOQ within a fraction of the time — with far greater accuracy.
CPWD/DSR Compliant: BOQ prepared as per CPWD Schedule of Rates and state PWD rate schedules for government projects.
Dynamic Cost Updating: Any design change instantly updates quantities and costs — no re-measurement required.
DPR-Ready Output: Structured BOQ and cost estimates formatted for Detailed Project Report (DPR) submissions to government authorities.
Each BIM dimension adds a layer of intelligence — 5D places cost at the heart of the model for continuous, accurate financial control.
From early concept cost plans to construction-ready BOQ and ongoing design change cost management.
Direct extraction of material quantities from Revit model geometry — concrete volumes, steel tonnage, brick quantities, floor areas, and more — with ±2% accuracy.
Structured Bill of Quantities (BOQ) in CPWD/DSR, PWD, or client-specific format — ready for government DPR submissions, tender documentation, and contractor pricing.
Early-stage cost plans structured by building element (substructure, frame, roof, finishes, MEP) for budget benchmarking and client approvals at each design gateway.
Instant re-quantification and cost impact reports when design changes occur — enabling real-time value engineering and cost control decisions.
Trade-by-trade cost breakdown (Civil, Structural, MEP, Finishes) to support procurement strategy, subcontractor pricing, and contract award.
Detailed Project Report (DPR) cost estimates for Water, Road, Irrigation, and building projects — formatted for GWSSB, GERI, NHAI, CPWD, and PMGSY submissions.
HRP Infra applies relevant government and industry rate schedules to ensure estimates are aligned with Indian procurement norms.
Central Public Works Department Schedule of Rates — used for central government and PSU project estimates.
Gujarat Water Supply & Sewerage Board rates for water sector infrastructure projects in Gujarat.
Gujarat Engineering Research Institute norms for irrigation and hydraulic structure cost estimates.
Gujarat State Public Works Department schedule for state-funded road and building projects.
Current supplier and sub-contractor quotations for project-specific or private sector estimates.
Royal Institution of Chartered Surveyors New Rules of Measurement for international client projects.
Receive and review BIM model quality, LOD, and embedded data for cost extraction readiness.
Add cost-related parameters and assembly codes to model elements for structured quantity extraction.
Run automated schedules from Revit to extract quantities by element, trade, zone, and level.
Apply CPWD/DSR/PWD or market rates to extracted quantities using structured rate libraries.
Compile structured BOQ in required format with trade breakdown, preliminary costs, and contingency.
Client review, value engineering workshop if required, and final submission in Excel/PDF/Word format.
5D BIM transforms cost estimation from a periodic exercise into a continuous, model-integrated financial management capability.
Quantities extracted directly from the model eliminate manual measurement errors, delivering ±2% accuracy compared to ±10–15% for traditional 2D takeoff.
BIM-based automated quantity extraction completes in hours what traditional 2D takeoff would take days or weeks to accomplish for complex projects.
When design changes occur, quantities and costs update automatically — keeping the estimate aligned with the current design without re-measurement.
Structured BOQ formatted for CPWD, GWSSB, GERI, and PWD government DPR submissions — meeting all standard Indian tender documentation requirements.
Cost-model integration enables rapid comparison of design alternatives, supporting value engineering decisions with instant cost impact visibility.
Detailed trade package pricing supports contractor procurement, tender evaluation, and contract award with a consistent, model-derived cost basis.
5D BIM adds cost as the 5th dimension to a 3D BIM model. By linking cost parameters to individual model elements in Revit, quantities are automatically extracted and priced — generating live BOQ and cost estimates that update dynamically whenever the design changes. This eliminates manual re-measurement and ensures budgets stay current throughout the design process.
Traditional quantity takeoff measures 2D drawings manually — a process subject to human error, scale inconsistency, and omissions. 5D BIM extracts quantities directly from the 3D model geometry, achieving ±2% accuracy. When the design changes, quantities update automatically without any re-measurement, keeping estimates always aligned with the latest design.
HRP Infra references CPWD Schedule of Rates (DSR), Gujarat PWD schedules, GWSSB rates (water sector), and GERI norms (irrigation structures) for government projects. For private sector work, we use current market rates from supplier and sub-contractor quotations. For international clients, we can apply RICS NRM or project-specific rate libraries.
Yes. HRP Infra has extensive experience preparing DPRs for government infrastructure projects in Gujarat. Our 5D BIM-based BOQ and cost estimates are structured to meet CPWD/PWD DPR format requirements and can be directly used for government sanction and tender submissions to GWSSB, GERI, NHAI, PMGSY, and state PWD authorities.
We deliver: structured BOQ in Excel (formatted for client and government requirements), PDF cost reports for submission, Revit schedule exports (CSV/Excel), elemental cost plans, and optionally linked spreadsheet models that dynamically update with model changes using Dynamo or manual exports.
HRP Infra's 5D BIM cost specialists in Ahmedabad deliver government-compliant BOQ, automated quantity takeoffs, and dynamic cost models — keeping your project on budget from concept to handover.