Transforming municipal and industrial solid waste into sustainable, commercial-grade renewable power.
Providing techno-commercial expertise for modern WtE plants.
Design support for mass-burn incineration, gasification, and pyrolysis systems tailored to local waste calorific values.
Comprehensive Techno-Economic Viability (TEV) reports to ensure the financial sustainability of power generation.
Engineering robust flue gas cleaning systems to ensure emissions meet strict environmental and PCB guidelines.
Electrical engineering services for substations, transformers, and seamless integration of WtE power into national grids.
Thermodynamic modeling and steam cycle optimization to maximize electrical output from minimal waste input.
End-to-end Project Management Consultancy, from contractor selection to final plant commissioning and handover.
Waste-to-energy (WtE) plants turn the non-recyclable, high-calorific part of municipal and industrial waste into electricity or process steam. Under the Solid Waste Management Rules, 2016, non-recyclable waste with a calorific value of 1,500 kcal/kg or more should not go to landfill and should instead be used for energy recovery, co-processing or refuse-derived fuel (RDF). A well-planned WtE plant therefore reduces landfill demand and gives a city a dependable outlet for its residual waste.
Whether a WtE plant works depends on the waste itself. Indian municipal waste is often wet and mixed, with a lower calorific value than the waste these technologies were first designed for. HRP Infra starts every WtE assignment with waste characterisation and a mass balance, so the technology, plant size and grid connection are matched to the waste a city actually produces, not to a nameplate figure.
Seasonal sampling of quantity, moisture, ash and calorific value, and a projection of waste generation over the plant life.
Comparison of mass-burn incineration, RDF combustion, gasification and pyrolysis against the waste profile, capital cost and operating risk.
Capacity sizing, tipping fee and power tariff assumptions, capital and operating costs, and a bankable financial model.
Plant layout, steam cycle, flue gas cleaning, grid connectivity and the supporting documents for environmental clearance and pollution control board consent.
Bid documents, contractor evaluation, construction supervision, performance testing and handover.
Mainly the dry, non-recyclable, combustible fraction left after segregation and material recovery, such as mixed plastics, textiles, paper and wood that cannot be recycled. The SWM Rules, 2016 point waste with a calorific value of 1,500 kcal/kg or more towards energy recovery rather than landfill.
There is no fixed population cut-off. What matters is a steady supply of suitable residual waste. Plants are usually viable only where several hundred tonnes per day of segregated combustible waste can be assured, which is why smaller towns often supply RDF to a regional plant or a cement kiln instead.
Typically environmental clearance, consent to establish and operate from the State Pollution Control Board, authorisation under the SWM Rules, a power purchase agreement or captive use arrangement, and grid connectivity approval.
HRP Infra works as the engineering consultant: feasibility, design, DPR, bid documents and project management consultancy. Construction and operation are carried out by the selected EPC or concession contractor under HRP Infra supervision where appointed.
Tell us about your project and our team will get back to you with next steps and a proposal.